These are the references the publisher has listed as being connected to the article. Please check the article itself for the full list of references which may differ. Not all references are currently linkable within the Digital Library.
| Armstrong (1997) CIM Bulletin Option pricing: a new approach to valuing mining projects 90, 37 |
| Camm (1994) Mining Engineering Simplified cost models for prefeasibility mineral evaluations June, 559 |
| Cavender (1992) Mining Engineering Determination of the optimum lifetime of a mining project using discounted cash flow and option pricing techniques Oct, 1262 |
| Davis (1995) Mining Engineering (Mis) use of Monte Carlo simulation in NPV analysis Jan, 75 |
| Davis (1996) Mining Engineering Using commodity price projections in mineral project valuation Apr, 67 |
| Davis (1998) Mining Engineering One project, two discount rates Apr, 70 |
| Dixit (1994) |
| Driscoll (1997) Mining Engineering From surface to underground: Newmont gold's Carlin east mine Aug, 23 |
| Smith (1994) Transactions of the Institution of Mineralogy and Metallurgy (Sect. A: Mining Industry) Discount rates and risk assessment in mineral project evaluations 103, A137 |
These are possibly similar items as determined by title/reference text matching only.