Dube, B. (2004) Timing of Gold Mineralization at Red Lake, Northwestern Ontario, Canada: New Constraints from U-Pb Geochronology at the Goldcorp High-Grade Zone, Red Lake Mine, and the Madsen Mine. Economic Geology, 99 (8) 1611-1641 doi:10.2113/99.8.1611
Reference Type | Journal (article/letter/editorial) | ||
---|---|---|---|
Title | Timing of Gold Mineralization at Red Lake, Northwestern Ontario, Canada: New Constraints from U-Pb Geochronology at the Goldcorp High-Grade Zone, Red Lake Mine, and the Madsen Mine | ||
Journal | Economic Geology | ||
Authors | Dube, B. | Author | |
Year | 2004 (December 1) | Volume | 99 |
Issue | 8 | ||
Publisher | Society of Economic Geologists | ||
DOI | doi:10.2113/99.8.1611Search in ResearchGate | ||
Generate Citation Formats | |||
Mindat Ref. ID | 226301 | Long-form Identifier | mindat:1:5:226301:8 |
GUID | 0 | ||
Full Reference | Dube, B. (2004) Timing of Gold Mineralization at Red Lake, Northwestern Ontario, Canada: New Constraints from U-Pb Geochronology at the Goldcorp High-Grade Zone, Red Lake Mine, and the Madsen Mine. Economic Geology, 99 (8) 1611-1641 doi:10.2113/99.8.1611 | ||
Plain Text | Dube, B. (2004) Timing of Gold Mineralization at Red Lake, Northwestern Ontario, Canada: New Constraints from U-Pb Geochronology at the Goldcorp High-Grade Zone, Red Lake Mine, and the Madsen Mine. Economic Geology, 99 (8) 1611-1641 doi:10.2113/99.8.1611 | ||
In | (2004, December) Economic Geology Vol. 99 (8) Society of Economic Geologists |
See Also
These are possibly similar items as determined by title/reference text matching only.