MORRISON, R, CLEARY, P (2004) Using DEM to model ore breakage within a pilot scale SAG mill. Minerals Engineering, 17 (11). 1117-1124 doi:10.1016/s0892-6875(04)00181-5
Reference Type | Journal (article/letter/editorial) | ||
---|---|---|---|
Title | Using DEM to model ore breakage within a pilot scale SAG mill | ||
Journal | Minerals Engineering | ||
Authors | MORRISON, R | Author | |
CLEARY, P | Author | ||
Year | 2004 (November) | Volume | 17 |
Issue | 11 | ||
Publisher | Elsevier BV | ||
DOI | doi:10.1016/s0892-6875(04)00181-5Search in ResearchGate | ||
Generate Citation Formats | |||
Mindat Ref. ID | 7715949 | Long-form Identifier | mindat:1:5:7715949:0 |
GUID | 0 | ||
Full Reference | MORRISON, R, CLEARY, P (2004) Using DEM to model ore breakage within a pilot scale SAG mill. Minerals Engineering, 17 (11). 1117-1124 doi:10.1016/s0892-6875(04)00181-5 | ||
Plain Text | MORRISON, R, CLEARY, P (2004) Using DEM to model ore breakage within a pilot scale SAG mill. Minerals Engineering, 17 (11). 1117-1124 doi:10.1016/s0892-6875(04)00181-5 | ||
In | (2004, November) Minerals Engineering Vol. 17 (11) Elsevier BV |
See Also
These are possibly similar items as determined by title/reference text matching only.
![]() | |
![]() | |
![]() | |
![]() | |
![]() | |
![]() | |
![]() | |
![]() | |
![]() | |
![]() | |
![]() |